One dated record, used by everyone on the job.
Every visit is flown from the same positions and walked on the same route, so each record lines up with the last one.
Lender draws
A dated aerial and interior record of each pay period's work in place.
Before it's covered
Every framing level, in-wall and above-ceiling condition photographed and placed on the plans before it is closed.
Neighbor and street claims
Condition of adjoining buildings, sidewalks and the street on each date, from the air and the ground.
Schedule
Progress against your milestones, with what changed since the previous visit.
Owner updates
A link the owner can open from anywhere instead of a site walk.
Close-out and leasing
A complete dated set from foundation to roof, with the 3D model, for the owner's file and marketing.
Start with one visit.
The intro capture is the full service at half price, with no commitment. After that, book visits one at a time or on a schedule. Paid per visit at booking.
Intro capture, one visit
- Aerial record of the whole site and structure: straight-down and angled passes at about 1 inch per pixel
- Site map (orthomosaic) and 3D model of the site
- 360 walk of every active level
- Comparison of the record against your plans and schedule milestones
- Dated progress report (PDF) and a private viewer link
- Downloadable files: photos with GPS, site map (GeoTIFF and JPG), 3D model (GLB and OBJ), 360 photos
- Delivered within 48 hours of the visit
| Service | How often | Price |
|---|---|---|
| Full site recordAerial record, site map, 3D model, 360 walk, report | Single visit | $2,950 |
| Full site record | Monthly | $2,650 / visit |
| Full site record | Every two weeks | $2,450 / visit |
| Aerial record onlyAerial record, site map, 3D model, report; no 360 walk | Any | $1,450 / visit |
| Interior 360 record only360 walk of every active level, placed on the plans, report | Any | $1,750 / visit |
| Add-on | Price |
|---|---|
| Report in 24 hours instead of 48 | $400 / visit |
| Extra visit for a pour, milestone or inspection, aerial only | $1,450 |
| Stockpile or cut and fill volumes from the 3D model | $300 / visit |
| Extra 360 walk of one area between visits | $600 to $1,200 |
Outside the San Francisco Bay Area: travel is charged at cost on every visit (airfare, rental car, lodging) plus per diem at the federal GSA rate for the job city. It is quoted in writing before booking and paid with each visit.
No minimum term; stop at any time. Sites over 5 acres are quoted separately. Maps, models and volumes are planning grade, not an inspection, an engineering opinion or a boundary determination. Prices valid through December 31, 2026.
A sample record: two visits, one week apart
120-unit podium apartment building, Bay AreaTwo morning flights a week apart during the mat foundation work, 501 and 473 photos from 82 ft and below. Both visits are flown from the same positions, so the second record lines up with the first and shows exactly what changed. Drag any slider: visit 1 on the left, visit 2 on the right.
What the second visit told the project team
- No concrete was placed that week. The work went into wall forms on the slab and preparing the next section for its pour.
- The next pour was taking shape. The formed area grew from 18% to 33% of the foundation, 4,368 sq ft in a week; open ground fell from 35% to 19%.
- The next pour measured about 683 cu yd, roughly 68 ready-mix truckloads, useful for ordering and for planning street access.
- The three loose stockpiles, 118 cu yd, were gone, and another 158 cu yd had been excavated.
- Four perimeter items were listed for the site team, including a storm drain inlet with no protection visible on either visit.
| Measured from the air | Visit 1 | Visit 2 | Change |
|---|---|---|---|
| Concrete placed | 13,665 sq ft | 13,665 sq ft | 0 |
| Formed for the next pour | 5,058 sq ft | 9,426 sq ft | +4,368 sq ft |
| Open ground | 9,882 sq ft | 5,503 sq ft | −4,379 sq ft |
| Excavated below sidewalk grade | 1,691 cu yd | 1,849 cu yd | +158 cu yd |
| Loose soil in stockpiles | 118 cu yd | 0 | −118 cu yd |
3D model of each visit. Switch visits at the top left; the view stays where you left it, so you can compare the same spot on both days. Drag to orbit, pinch or scroll to zoom, two fingers to move. On a phone, tap View in AR to place it on a table.
Visit 1Visit 2
Visit 1Visit 2
Photographs from the same positions
Visit 1Visit 2
Visit 1Visit 2
Visit 1Visit 2
Visit 1Visit 2
Visit 1Visit 2
Visit 1Visit 2
Visit 1Visit 2
Visit 1Visit 2
Each visit-2 photo is paired with the closest visit-1 view and matched on the street, curbs and neighboring roofs. Tall wall forms shift a little because the drone is never in exactly the same spot.
What a record is worth on your project
What each part of the record is used for, and the published cost of the risk it helps with. These are reference costs, not a promised saving: the value depends on what the record catches and how quickly it is acted on.
| Use | What the record gives you | Reference cost of finding out late |
|---|---|---|
| Owner oversight | A measured weekly view of the site in 3D, from anywhere, comparable visit to visit. | Each site visit by an out-of-town owner or manager is a day of senior time plus travel. |
| Pay application review | An independent check on reported percent complete: placed, formed and open areas measured each visit. | Flags a billed percentage that does not match the site before it is paid. |
| Built work against the drawings | Placed and formed areas laid over your plans every visit. | Studies put rework at a median of about 4 to 6% of direct project cost, about 9% with indirect cost; poor project data and communication cause 48% of it. |
| Stormwater | A dated overhead view of inlet protection and perimeter controls each visit. | Up to $10,000 per day of violation (California Water Code section 13385(c)). |
| Site safety | Open excavation edges and tall forms seen from above, listed for the site team. | Up to $25,000 per serious Cal/OSHA violation. |
| Delay and claims | A dated, measured sequence of what was built when, independent of either party. | Delay is usually priced as daily general conditions times the days of delay; the argument is about when work happened, which the record shows. |
| Lender and investor reporting | Percent complete, paired photos and the 3D model, ready to attach to a draw request or an update. | Saves assembling the same material by hand each month. |
Sources: California Water Code section 13385(c); Cal/OSHA penalty maximums, DIR news release 2025-10; rework medians from Dougherty and Hughes, compiled by PlanRadar; share of rework from poor data and communication, FMI and PlanGrid, Construction Disconnected (2018).
How it works
You book the visit, I capture the site, and you get the report and the files.
Book and pay
Send the project address and a few dates. I check the airspace and confirm with your superintendent.
Site visit
The drone flight from public right of way or a spot the site assigns, then the 360 walk of every active level. Site rules and PPE followed.
Report in 48 hours
The dated report, the viewer link and the files, compared against your plans and the last visit.
Next visit
Same flight positions and the same walk route, so every record lines up with the one before.
Who flies it
Felix Barker, founder of iNVEEY. iNVEEY does drone and 360 capture for builders, developers and property managers around the Bay Area.
- License
- FAA Part 107 remote pilot
- Airspace
- Checked before every flight; FAA authorization requested near airports
- Area
- Based in the San Francisco Bay Area. Jobs across the West Coast and the Southwest, with travel at cost.
- Contact
- Felix's contact card or felixobarker@gmail.com
Book a capture
Send this and I get it right away. I reply with a time and a payment link, usually the same day.